free calculator

Knowledge loss calculator

When an engineer leaves, the cost isn't just hiring a replacement. It's the interpretive layer that walks out the door. See what each departure actually costs.

Your inputs

Model a specific departure, or a typical one for your team.

Years at the company

3 yr
110

Affects replacement multiplier

For remaining engineers consumed by transfer

$150
80250

1 = tribal knowledge only, 10 = comprehensive

4/10
110
Total cost of this departure
$292K
Direct + indirect costs over the next 12 months
Replacement cost$220K

Recruiting, comp differential, signing, for a comparable replacement.

Knowledge transfer$17K

112 hours of remaining team time spent transferring context.

Re-discovery$22K

144 hours re-trying ruled-out approaches and re-deciding what was already decided.

Ramp productivity loss$33K

3-month ramp at ~50% productivity for the replacement.

What context infrastructure changes
$21K
Recoverable per departure
7%
Of total departure cost

Declared-state records capture the interpretive layer that usually exits with the departing engineer. The decisions and rationale stay in the record, and the re-discovery cost shrinks significantly.

Build the context layer →

Email yourself these results

A copy to share with your team, no signup required.

What one person knows should not leave with them.

See this on your team’s questions, not ours.

See it on your team’s workSee a StandIn answer